Battelle Darby Restroom Building
Columbus & Franklin County Metro Parks
About This Project
This project was constructed primarily of concrete masonry units and heavy timber roof framing. The project emphasis was on low maintenance and sustainable materials. This project featured drip irrigation and a private sanitation system.
Low maintenance features include the use of:
Indirect lighting (in chase to avoid vandalism)
Concrete block walls
Glass block windows
40 year warranty shingles
Concrete based exterior siding
Sustainable features include the use of:
Daylighting controller sensors
Skylights
Recycled content wall insulation
Low VOC paints and stains
Recycled content toilet partitions
Waterless urinals
Soy based concrete curing treatment
Sustainable Forestry Initiative Program for wood framing
Visit Battelle Darby Creek Metro Park