Gallipolis Developmental Center AT Building HVAC & Roof Replacements

Ohio Department of Developmental Disabilities / Ohio Facilities Construction Commission (OFCC)

The GDC’s AT Building was originally constructed in 1978 and is a 1-story, 43,737 SF facility. The project scope included the following:

  • Complete replacement of the ballasted, built-up roof system, as well as three roof-top HVAC units and one ground-mounted pool unit and associated controls

  • Replacement of the current centralized steam-to-hot water heating system to a standalone gas-fired boiler heating system and related controls system

  • Demolition and removal the existing decommissioned absorption chiller and associated cooling tower from the building’s mechanical mezzanine area

  • Development of a complete Program of Requirements (POR) that includes a comprehensive survey/field investigation of the existing HVAC system and roofing system at the AT Building

The project includes HVAC and mechanical work in several of the resident cottages as follows:

  • Design hot water and domestic hot water to eliminate the need for steam at Cottages 6042, 6043, 6044 and 6050

  • Design domestic hot water to eliminate the need for steam at Cottages 6045, 6046, 6047 and 6048

  • Design of hot water, domestic hot water and a dishwasher for the Administration Building

  • Design for replacement of associated controls to match existing system at the AT Building

  • All phases of the project are complete except for Owner requested additional scope to replace boilers which is on schedule for completion in 2025.